Wayfinding · Statutory · Accessibility
Wayfinding signage that guides people
Passenger- and visitor-centred wayfinding for complex built environments — precincts, transport hubs, car parks, campuses and health facilities — documented, approved and installed exactly as designed.
Who it’s for
Built for the people who specify and deliver it
Whether you’re protecting a design or rolling out a system across many sites, we take the coordination off your plate.
Architects, designers & builders
Your design intent, delivered to the letter
- Detailed shop drawings that match your documentation
- Compliance review before anything is manufactured
- Install coordinated with your trades and programme
- One point of contact — no chasing suppliers
Multi-site operators
Consistent wayfinding across every location
- One standard applied identically on every site
- Rollouts planned around trading and operations
- Accessibility and council requirements handled for you
- Installation within live operational environments
- Fixed pricing for repeat sign types
What we deliver
The full lifecycle of wayfinding signage
From sign location mapping and schedules to fabrication, installation and long-term maintenance.
-
01
Directional & wayfinding
Pylons, blades and directional signs that lead people through precincts, campuses and buildings.
-
02
Car park & parking
Entry, clearance, level and bay signage that keeps traffic and pedestrians moving safely.
-
03
Statutory & regulatory
Required safety and regulatory signage, specified and placed to meet code.
-
04
Accessible, tactile & braille
Signage designed to Australian accessibility requirements, including tactile and braille.
-
05
Directories & tenant boards
Building and precinct directories, backlit or static, designed for easy updates.
-
06
Sign location mapping & schedules
Location plans and signage schedules prepared to support documentation and approvals.
-
07
Temporary & operational signage
Signage for changing environments — staged works, detours and operational updates.
-
08
Digital housings & road gantries
Custom housings for non-standard digital displays, plus road gantry fabrication and install.
Quality control & compliance
A six-step quality assurance process
Every sign is checked against approved specifications, finishes and wayfinding standards — with factory-level quality control, project managers overseeing production and our Managing Director hands-on in manufacturing.
If something isn’t right, we inspect and correct it promptly, with site attendance typically within 7 working days.
-
01
Drawing & specification review
Approved artwork, dimensions, materials and finishes checked against your documentation.
-
02
Internal drawing checklist
Artwork set-up, sizing and fabrication details verified by our documentation team.
-
03
Client & NSB approval
Final drawings confirmed with you before anything goes into production.
-
04
Pre-production verification
Materials, finishes and manufacturing requirements checked before fabrication starts.
-
05
Manufacturing quality control
Factory checks, with project managers monitoring production throughout.
-
06
Installation & final inspection
Signage accuracy and quality verified on site after installation.
Scale & delivery
Built for high-volume, complex programs
A structured delivery model, backed by four manufacturing facilities and a dedicated project team, lets us deliver large packages — hundreds of units a year — without compromising quality.
Manufacturing capacity
Four facilities — one in Sydney, two in China and one in the Philippines — to handle standard volumes and peak demand.
Typical lead times
- Standard signage: 2–4 weeks
- Complex or large-format: 6–8 weeks
- Large-scale or specialised: 8–12 weeks
One point of contact
A dedicated project manager coordinates day to day, with our Managing Director providing oversight and escalation.
Your systems, your process
Experienced with Aconex, Procore and ServiceNow — and happy to work within your approval workflows.
Maintenance & lifecycle support
Signage that stays accurate long after handover
- Ongoing maintenance, replacement and updates as your site changes
- Operational manuals and project handover documentation
- Information to support asset registers and future maintenance
- Quotes for variations and urgent requests, often within 24 hours
Recent projects
Wayfinding in the field
FAQs
Common questions
Can’t see your question? Call us on (02) 9678 9540.
Can you work from our architectural drawings?
Yes. Every project starts with a drawing and specification review, then detailed shop drawings for your approval — so what’s installed matches what was designed.
What are your typical lead times?
Standard signage typically takes 2–4 weeks and complex or large-format signage 6–8 weeks. Large-scale or specialised signage can take 8–12 weeks, depending on scope, materials and site coordination.
Can you work within live, operational environments?
Yes. We schedule installs around your operations and site access, and have experience in complex environments including airports, health facilities and active construction sites.
What happens if there’s a defect?
We inspect and take corrective action promptly, with site attendance typically within 7 working days.
Do you work with our project systems?
Yes. Our team uses Aconex, Procore and ServiceNow, and adapts to client-managed request and approval processes.
Can you deliver across multiple sites?
Yes. Four manufacturing facilities and fixed pricing for standard sign types let us deliver consistent signage across every location, at scale.